IEC 62443 zones and conduits for the people who actually wire the plant
Most writing about IEC 62443 is aimed at the people who sign off on security programs. This one is for the people who pull cable, land wires, configure switches and build panels. Zones and conduits get decided in a risk assessment, but they live or die in the field: in the drawing set, the switch config, the panel layout and the laptop someone plugs in at 2 a.m. during a breakdown. If the zone model on paper doesn't match what's physically wired, the plant isn't secure, it just has good documentation.
What a zone and a conduit actually are
A zone is a group of assets that share the same security requirements. In practice that means equipment with similar criticality, communication patterns and security needs (IEC, 2020; Stouffer et al., 2023): the PLCs, HMIs and drives on one process line, the safety controllers, the historian and engineering workstations, and so on.
The standard defines a conduit as a logical grouping of communication channels that connects two or more zones and shares common security requirements (IEC, 2020). The key word is logical. A conduit is not a cable. It's every path that traffic can take between two zones: the fiber trunk, the remote access VPN, the serial gateway, the cellular modem in a vendor's skid, and the USB stick that walks between the engineering laptop and the HMI. If data can cross, it's part of a conduit, and it needs to be documented and controlled.
That distinction is where most field problems start. Teams draw one tidy line between the control zone and the plant DMZ, then discover three more paths nobody drew.
Where zones come from (and why you should care)
IEC 62443-3-2 (IEC, 2020) lays out the process as seven zone and conduit requirements, or ZCRs:
1. Identify the system under consideration (SUC).
2. Perform an initial cybersecurity risk assessment.
3. Partition the SUC into zones and conduits.
4. Compare initial risk to tolerable risk.
5. Perform a detailed risk assessment for each zone and conduit.
6. Document the cybersecurity requirements, assumptions and constraints.
7. Get asset owner approval.
The field crew usually only sees the output of step 6. But step 3 includes rules that directly affect how you wire: keep business and control system assets apart, separate safety-related assets, and treat temporarily connected devices, wireless devices, and devices reached through external networks as their own groupings. Every one of those has a physical meaning. A temporarily connected device is the vendor laptop. A wireless device is the handheld scanner or the wireless I/O gateway somebody added during a retrofit. An external network connection is the OEM's remote support box.
The standard says which steps to take but not exactly how to carry them out. Brancati et al. (2025) make that point about the detailed risk assessment in ZCR 5 and propose a full methodology to fill the gap. For the field team the lesson is simpler: ask for the ZCR 6 documentation before you start building, because that is where the decisions you have to wire to are written down.
Security levels, in plain terms
Each zone and conduit gets a target security level (SL-T) from 1 to 4 (IEC, 2013). Following the summary in Braband (2016), roughly: SL 1 protects against accidents and casual mistakes, SL 2 against intentional attacks with simple means and generic skills, SL 3 against sophisticated attackers with ICS-specific skills and moderate resources, and SL 4 against well-resourced, highly motivated attackers. Practitioner guidance commonly treats SL 2 as the baseline, with a few critical zones pushed to SL 3 (Opsio, 2026).
Two details matter on the floor. First, the security level is not one number; it's set per foundational requirement (identification and authentication, use control, system integrity, data confidentiality, restricted data flow, timely response to events, and resource availability), so a zone's target is really a set of seven values, which Braband (2016) calls the SL vector. Second, the standard separates what you're aiming for (SL-T), what the equipment can do when properly configured (SL-C, capability), and what you actually achieved once commissioned (SL-A). The gap between SL-C and SL-A is almost always installation and configuration: default passwords left in place, unused switch ports left live, a managed switch running like an unmanaged one.
Turning the zone drawing into a wiring plan
Knapp and Langill (2014) cover the network side of this in depth in their chapter on establishing zones and conduits. What follows is the version for the cabinet: how the model translates into decisions an installer or panel builder actually makes.
Draw the boundary where the equipment already is. NIST's guide to OT security treats segmentation as a core defense (Stouffer et al., 2023), but in a running plant it rarely starts with new cable. Most plants have flat networks, where every machine is one hop from the office. You don't have to rip out and re-cable a line to fix that: put the boundary directly in front of the equipment you already run. The PLCs, drives and I/O inside it keep working exactly as they did, and anything that wants to reach them has to cross the boundary. On new builds, separate switches or VLANs per zone and zone labels on cabinets, patch panels and cable jackets still pay off; color-coded patch cords stop the most common mistake, which is plugging a device into whatever port is free.
Every conduit needs something that can say no. The traditional answer is an industrial firewall, a data diode or a router with access control lists at the zone edge. Zero trust moves that check closer to the asset: no device gets trusted just because of where it sits on the network, and both ends of a connection are authenticated and authorized before any session starts (Rose et al., 2020). On the plant floor that looks like default-deny rules, mutual TLS between devices, and identity tied to the device rather than to an IP address someone can borrow. A plain switch uplink between two zones is not a conduit boundary. If you can't point to what enforces the conduit, the two zones are one zone.
Document the conduit, not just the cable. For each conduit, record which zones it connects, which protocols and ports are allowed, which direction traffic flows, and who owns the rules. Better still, keep those rules as configuration in version control. Then the rules that run are the rules on paper, and every change has a name and a date attached. That record becomes the rule set, the acceptance test and the audit trail.
Keep safety separate for real. Safety instrumented systems get their own zone. Sharing a switch, a power supply or an engineering workstation with the basic process control system quietly merges the zones.
Close the doors remote access opens. A remote-access VPN is a conduit to everything it reaches: once a laptop is on it, it's effectively on the floor. A tighter pattern is outbound-only. The plant dials out, no inbound ports are open, and a vendor or maintenance session runs over an authenticated tunnel that ends at the one asset it needs. Give the vendor laptop that controlled path instead of an open port on the control network. If it has no proper place to plug in, it'll get plugged in somewhere improper.
Hunt for the hidden conduits. Cellular modems inside OEM skids, dual-homed PCs with two network cards, wireless bridges, serial-to-Ethernet converters and remote access tools installed for one project and never removed. Walk the cabinets with the zone drawing in hand and flag anything that bridges two zones without going through an enforcement point.
Shut what you don't use, and stop managing secrets by hand. Disable unused switch ports and services the device doesn't need. Shared passwords on a sticky note inside the cabinet door are how SL-C fails to become SL-A. Certificates and credentials that are issued centrally and rotated automatically close that gap without adding work for the field crew.
Design for the link going down. Resource availability is one of the seven foundational requirements, and it applies to conduits too. A zone should keep producing if its link to the central site or to a cloud service drops. Keep control local, let data sync when the link comes back, and don't build a conduit that makes the line depend on someone else's cloud. Some zones belong fully air-gapped.
Commissioning: prove the conduits
A zone model isn't done when the drawing is approved. It's done when you've tested it. Before handover, confirm that only the documented flows cross each conduit, that blocked traffic is actually blocked, that nothing outside the plant can reach an inbound port, that a device without a valid identity gets refused, and that the as-built drawings match what's in the cabinets. Pull the uplink on one zone and check that the line keeps running. Hand the asset owner the conduit list, the rule set and the test results together. That package is what keeps the design intact after the next contractor shows up.
The bottom line
IEC 62443 zones and conduits are not an IT abstraction, and they don't require a rip-and-replace project. They're boundaries the field team builds around the equipment the plant already runs. Draw the boundary in front of what you have, make every connection prove who it is, keep remote access outbound-only, design each zone to survive a lost link, and test it all before you leave. That's how a security design on paper becomes a secure plant that keeps producing.
Take the next step
If you're dealing with a flat network, a remote-access setup your IT team won't sign off on, or a line you can't afford to stop, visit embernet.ai and request a demo. Bring your network diagram: we'll show you where the zones and conduits fall and how to enforce them without shutting anything down.
References
Braband, J. (2016). Why 2 times 2 ain't necessarily 4 – at least not in IT security risk assessment. arXiv:1603.03710. https://arxiv.org/abs/1603.03710
Brancati, F., Mongelli, D., Mariotti, F., et al. (2025). A cybersecurity risk assessment methodology for industrial automation control systems. International Journal of Information Security, 24, Article 76. https://doi.org/10.1007/s10207-025-00990-9
International Electrotechnical Commission. (2013). IEC 62443-3-3:2013 Security for industrial automation and control systems – Part 3-3: System security requirements and security levels. IEC.
International Electrotechnical Commission. (2020). IEC 62443-3-2:2020 Security for industrial automation and control systems – Part 3-2: Security risk assessment for system design. IEC. https://webstore.iec.ch/en/publication/30727
Knapp, E. D., & Langill, J. T. (2014). Industrial network security: Securing critical infrastructure networks for smart grid, SCADA, and other industrial control systems (2nd ed.). Syngress.
Opsio. (2026). What is IEC 62443? https://opsiocloud.com/knowledge-base/what-is-iec-62443-standard/
Rose, S., Borchert, O., Mitchell, S., & Connelly, S. (2020). Zero trust architecture (NIST SP 800-207). National Institute of Standards and Technology. https://doi.org/10.6028/NIST.SP.800-207